Henan Zhongsui Engineering Equipment Co., Ltd.
Home > News > Content
Treatment And Transportation Of The Muck During Tunnel Construction
- Apr 01, 2017 -

In shield method metro tunnel construction, from the surface excavated muck will through adding additives water, bentonite, bubble additives, mixed stirring evenly, make the waste residue has better flow plasticity, does not occur separation ,in the shield earth pressure warehouse form the soil pressure, balance the earth constraints,keep the face  force balance.

During the shield continuous excavation, excavation mucks step into the soil pressure cabin, soil pressure cabin through a screw casting device make the same speed ratio to transport out the soil, then by conveyor to install to the muck car.

25T diesel metro locomotive 

Henan Zhongsui Engineering Equipment is a company professional manufacture tunnel construction used rail transporting machinery equipments, conglomate withy development, design, produce, sales machinery manufacturing enterprises, mainly produce: Tunnel construction equipment, tunnel construction used locomotives, mechanical and electric used tractor, tractor, electro locomotives, mechanic-electric tractor, muck car, mortar vehicles, segment car, etc tunnel construction equipment. Welcome customer’s visit and cooperation in the near future!