The Muck Waste Residue Treatment And Transportation In The Tunnel Construction
- Aug 31, 2017 -

In the shield Metro tunnel construction in the shield method, the muck from the excavation face should through adding additives such as water, bentonite, bubble, mixed stirring evenly, make the waste residue has better flow plasticity, not occur segregation,in the shield earth pressure in the formation of soil pressure in the warehouse, to balance the earth pressure on the shield face, to keep the shield face force balance

Shield continuous excavation, excavation muck residue into the soil pressure cabin,the earth pressure cabinet through a spiral casting as the same rate  to exclude the soil out of the earth pressure cabinet, then through the transmit belt to load in the muck car



Henan Zhongsui Engineering Equipment Co., Ltd CTEE is one company professional focus on the tunnel construction rail transportation equipment, conglomerate with design, development, manufacturer, and sales of mechanical manufacturing enterprise. Our Main product including: tunnel construction equipment, TBM back-up equipment, like battery locomotive, Shield supporting diesel locomotive, diesel electric locomotive, battery powered locomotives, muck car, grount car, segment car, flat car, man-ride car, 38A rail, Rail sleeper and anchor fixing, Tipping Device, Rail switching(California etc) shield supporting machinery, all with ISO 9001:2008 international certifications.