Henan Zhongsui Engineering Equipment Co., Ltd.
Home > News > Content
The Hengyang River Tunnel Passes Through The Lowest Point Of The River
- Feb 23, 2018 -

The north line of the xiangjiang tunnel in Hengyang city, excavated reaches 510 meters and crosses the lowest point of the river.The tunnel was started in December 2016 with a total length of over 1,800 meters and a total investment of 1 billion yuan. It is the first tunnel in hengyang city.The tunnel is constructed by shield method, which is divided into south and north lines.The south line has been completed on September 13, 2017, and the north line will be completed in May.


Henan Zhongsui company are mainly manufacturing Tunnel equipment, tunnel construction equipment, tunneling construction equipment, tunnel construction used tractor,tunnel tow car, shield supporting equipment, shiled construction traction locomotive and supporting transportation equipment, rail locomotive,mining locomotive electric locomotive, locomotive, muck car, mortar car, segment car, etc. 


Welcome your cooperate