Henan Zhongsui Engineering Equipment Co., Ltd.
Home > News > Content
Shield Tunnel Construction Used Electrical Diesel Locomotive Technical Parameters
- Jul 19, 2017 -

During the shield tunnel construction, excavated muck will through added water, and bentonite, and bubble, mixed stirring evenly, make the waste residue has better flow plasticity, not happen segregation, at the shield earth pressure forms soil pressure, balance the face soil pressure, keep the face force balance. 


The shield continuously excavation, excavated soil into the soil pressure storehouse, the soil box pressure backside has one screw spiral dump devices at the same speed ratio to to eliminate the soil, then through the conveyor belt make the soil put into the muck car.


Henan Zhongsui tunnel engineering equipment co., LTD. Is a company specializing in the production of the tunnel construction in railway transportation machinery and equipment, cognate with design, development, production, sales machinery manufacturer, mainly produce:tunnel construction equipment, tunnel construction with traction locomotive, electromechanical integrated traction locomotive, tractor, electrical tractors, muck cars, slurry residue car, segment car tunnel construction equipment. Welcome customer come to our company and factory to visit and negotiate!